Overhead electrical lines exceeding AC 1 kV - National Normative Aspects (NNA) for Poland (based on EN 50341-1:2012) subscription-only as well as the aggregation
$174.00
Description
as well as the aggregation of information by third-party suppliers
Although this code of practice is not intended to include industrial type powered doors and powered turnstiles
conditional
It is also applicable to breakers intended to work downwards to break hard materials (concrete
Laboratory quality assurance
Overhead electrical lines exceeding AC 1 kV - National Normative Aspects (NNA) for Poland (based on EN 50341-1:2012) subscription-only as well as the aggregation1. Scope 1. 1 General PL. 1 Scope of application This NNA determines the requirements which shall be fulfilled while designing and constructing of new overhead lines with nominal system voltages exceeding 1 kV AC. The scope of use of this NNA for temporary lines shall be determined by the Project Specification. For modernisations, reconstructions and refurbishments of the existing lines, the scope and the requirement to comply with PNEN503411,
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 540.00
US$ 133.65
US$ 641.25
US$ 133.65
US$ 641.25
US$ 438.75
US$ 540.00
US$ 540.00